| CLIENT |
Hill &
Company |
| LOCATION |
San Francisco |
| CREW SIZE |
6 workers |
| DURATION |
2 months |
|
| JOB
PROFILE |
|
|
|
This handsome building
in Pacific Heights was a fairly typical preparation
and coating project. The building had lead based coatings
which required special preparation procedures by certified
workers. There were structural issues with the masonry
that required fairly extensive spall repair. This was
followed by thorough caulking, patching and coating
with an elastomeric waterproof coating. |
 |
|